Enhancing Flood Control Reliability at Waterbury Dam

During routine maintenance at Waterbury Dam, the U.S. Army Corps of Engineers (USACE) identified operational behaviors suggesting potential excess resistance in the gates’ trunnion pins. that raised concerns about the performance of the dam’s spillway gates. Given the critical role these gates play in flood control, ensuring reliability of the dam’s spillway gates was essential.…

Read More

Supporting Miter Gate Maintenance on the Upper Mississippi River

BDI has partnered with the St. Paul District of the U.S. Army Corps of Engineers (USACE) to support ongoing maintenance operations at Lock & Dam sites along the Upper Mississippi River. In the winter, during the off-season for river traffic, these sites are dewatered on a scheduled cycle to allow for inspection and maintenance of key structural components,…

Read More

Tiger Creek Gates

BDI rope access technician prepares gate for sensor install

Tiger Creek Afterbay Dam, originally constructed in 1931, stands approximately 120 feet tall and 400 feet wide. It features ten spillways equipped with steel Tainter gates and is owned and operated by Pacific Gas and Electric (PG&E). BDI had previously performed pin friction testing on these gates in 2015, and returned in 2024 to reassess…

Read More

Lake Limestone Spillway

Sterling C. Robertson Dam impounds the Navasota River forming Lake Limestone, which serves primarily as a water supply reservoir. The dam, completed in 1978, features an approximately 250-foot-wide concrete service spillway which has been slated for significant rehabilitation. As part of the rehabilitation effort, BDI was engaged by Stantec to locate and measure the extent…

Read More

DeCordova Bend Dam: Ultrasonic Tomography

The DeCordova Bend Dam forms the Lake Granbury Reservoir on the Brazos River southeast of Granbury, TX and was constructed between 1966 and 1969. In conjunction with other consultants, BDI performed concrete material sampling and a nondestructive evaluation (NDE) at select portions of the dam to facilitate operational and structural improvements to the dam. A…

Read More

DeCordova Bend Dam: Ultrasonic Testing

The DeCordova Bend Dam forms the Lake Granbury Reservoir on the Brazos River southeast of Granbury, TX and was constructed between 1966 and 1969. In conjunction with other consultants, BDI performed concrete material sampling and a nondestructive evaluation (NDE) at select portions of the dam to facilitate operational and structural improvements to the dam. A…

Read More

DeCordova Bend Dam GPR

The DeCordova Bend Dam forms the Lake Granbury Reservoir on the Brazos River southeast of Granbury, TX and was constructed between 1966 and 1969. In conjunction with other consultants, BDI performed concrete material sampling and a nondestructive evaluation (NDE) at select portions of the dam to facilitate operational and structural improvements to the dam. A…

Read More

Big Creek Dams 5 and 6 Concrete Material Testing

Big Creek Dams 5 and 6 impound water along Big Creek near Big Creek, California and were constructed in 1921 and 1923, respectively. New increases to minimum instream flows (MIF) require increasing the diameter of existing MIF conduits through the dams. The dam owner contracted a consultant to design the larger MIF conduits and associated…

Read More

Big Creek Dams 5 and 6 – Anchor Testing

Big Creek Dams 5 and 6 impound water along Big Creek near Big Creek, California and were constructed in 1921 and 1923, respectively. New increases to minimum instream flows (MIF) require increasing the diameter of existing MIF conduits through the dams. The dam owner contracted a consultant to design the larger MIF conduits and associated…

Read More